![]() Watch a new Dana being built at Pacific Seacraft in Fullerton, CA Previous, Page 2 of 5, Next | |
![]() | The completed hull has been moved into the shop proper and will next have the solid lead casting installed in the keel cavity. |
![]() | With the lead casting bonded tightly inplace and glassed over, SSB copper grounding foil is installed and the entire bilge area recieves a heavy layer of gel coat. |
![]() | The interior module has been lowered into the hull. Mating surfaces are securely bonded, faired, and gel coated. No uncoated fiberglass surfaces will be left exposed. |
| Previous, Page 2 of 5, Next | (Top) |
| Back to the Dana |