Watch a new Dana being built
at Pacific Seacraft in Fullerton, CA



Page 1 of 5,  Next

A new Dana hull is lifted out of the mold. The bright orange release coating in the mold reflects on the smooth, glossy surface.


The hull is prepared for a glossy blue boot and sheer stripe, while the sturdy interior module is readied for installation.


The stripes applied,
Dana already strikes a formidable pose.



Page 1 of 5,  Next (Top)
Back to the Dana